Accessibility Tools

Freeport Hancock Bridge
Hancock Avenue Bridge rehabilitation ensures decades of safe, reliable travelFreeport, Illinois SERVICES» Topographic survey.» Construction plans and specifications.» Engineering design.» Bidding.» Construction services.» Project and contract management. The Hancock Avenue Bridge is an important connection to the east side of Freepor...
Continue reading
Vinton Mud Creek Bridge
Preliminary work paves the way for safe, sustainable Mud Creek Bridge replacementVinton, Iowa SERVICES» Preliminary engineering and budgeting.» Topographic survey.» Engineering design.» Iowa DOT coordination. The Mud Creek Bridge on East 13th Street in Vinton, Iowa, is a country bridge that spans Mud Creek. Built in 1965, the wo...
Continue reading
Illinois Central College Pedestrian Bridge
Illinois Central College pedestrian bridge features landscape, designEast Peoria, Illinois SERVICES» Topographic survey.» Engineering design.» Shop drawing review.» Geotechnical analysis.» Landscape architecture. To enhance connectivity and update infrastructure, Illinois Central College's East Peoria campus needed to repla...
Continue reading
Vine Street Bridge
Vine Street Bridge boosts safety and connectivityCenter Point, Iowa PERIOD OF SERVICEAugust 2019 to July 2021 AT A GLANCE» Survey.» Easement preparation.» National Environmental Policy Act clearance.» Design.» Plan development.» Utility coordination. » Construction oversight.  For nearly 30 years, Fehr Graham has been a trusted partner providi...
Continue reading
Rock Valley College Pedestrian Bridge
Pedestrian bridge provides better access for studentsRockford, Illinois PERIOD OF SERVICESJune 2017 to April 2018 CONTRACT VALUE$57,030 SIZELength: 70 feetWidth: 10 feet In 2017, Rock Valley College in Rockford, Illinois, completed renovations to Classroom Building 1 (CL1). To get to the new building, many students were backtracking to the Student ...
Continue reading
Jane Addams Memorial Tollway widening, reconstruction reduces congestion
NORTHERN ILLINOIS PERIOD OF SERVICESMarch 2012 to November 2014 CONTRACT VALUE$1,400,000 CONSTRUCTION COST$14,000,000 AT A GLANCE» Prepared plans and specifications.» Obtained permitting.» Completed topographic surveys.» Prepared signal designs. The Illinois State Toll Highway Authority completed the reconstruction of I-90 from Rockford to Chicago ...
Continue reading
Auto surveying method used on Savanna-Sabula Bridge reconstruction project
SAVANNA, ILLINOIS  PERIOD OF SERVICESSeptember 2015 to June 2018 CONTRACT VALUE$142,250 CONSTRUCTION COST$80,645,311 SIZELength: 2,600 feetWidth: 30 feet The Savanna-Sabula bridge, built across the Mississippi river in 1932, connected Illinois and Iowa and was reconstructed in 1985. The average traffic lane is around 12 feet, but the stee...
Continue reading
Environmental site investigation completed before Morgan Street Bridge replaced
ROCKFORD, ILLINOIS SERVICES» Reviewed documents.» Conducted site investigation.» Prepared site investigation results and monthly progress reports.» Evaluated remediation options and costs.» Estimated special provisions, pay items and quantities.» Attended project kick-off, city official and internal meetings.» Completed field checks and plan-in-han...
Continue reading
Century-old bridge replaced for stability, structure
KENDALL, WISCONSIN PERIOD OF SERVICEJanuary 2018 to June 2018 CONTRACT VALUE$45,000 CONSTRUCTION COST$313,519 SIZELength: 40 feetWidth: 28.5 feet SERVICES» Completed construction inspection services.» Coordinated utilities. Bethel Grove Road bridge, built in 1917, needed to be replaced because it was too narrow for agricultural traffic and was stru...
Continue reading
County Highway I bridge replaced
SHULLSBURG, WISCONSIN PERIOD OF SERVICESAugust 2017 to May 2018 CONTRACT VALUE$50,492 CONSTRUCTION COST$399,367 SIZELength: 46 feetWidth: 30 feet County Highway I's bridge over Kelsey Branch, built in 1912 and reconstructed in 1950, needed to be replaced. The area experienced flooding, damaging the bridge. This prompted the Wisconsin Department of ...
Continue reading
Replacing an 80-year-old bridge
CENTER POINT, IOWA PERIOD OF SERVICESeptember 2017 to November 2017 CONTRACT VALUE$2,500 SIZELength: 21 feetWidth: 24 feet  AT A GLANCE» Preparation of concept statement.» Preparation of environmental data sheets.» Determination of effect on threatened and endangered species. The Franklin Street bridge in Center Point, Iowa, has stood strong t...
Continue reading

Please publish modules in offcanvas position.