Solving water infiltration issues at Hanley Administration Building
SPRINGFIELD, ILLINOIS PERIOD OF SERVICESApril 2016 to March 2017 CONTRACT VALUE$20,360 CONSTRUCTION COST$1,760,000 The Hanley Administration Building was built in 1968. The three-story building has a basement that extends beyond the exterior walls of the first level. An approximately 38,000 square foot concrete plaza around the building's perimeter...
Continue reading
Masonry investigation at Construction Engineering Research Laboratory
CHAMPAIGN, ILLINOIS PERIOD OF SERVICESJuly 2019 to September 2019 CONTRACT VALUE$8,875 The Construction Engineering Research Laboratory (CERL) and the Construction Materials Laboratory buildings at the University of Illinois at Urbana-Champaign suffered from chronic cracks in the exterior brick walls since the construction of the buildings in 1969....
Continue reading
President Abraham Lincoln's receiving vault restored
SPRINGFIELD, ILLINOIS PERIOD OF SERVICESFebruary 2014 to May 2015 CONTRACT VALUE$56,500 CONSTRUCTION COST$386,000 Time had not been kind to the receiving vault that once held the bodies of President Abraham Lincoln and his 11-year-old son, Willie, who died at the White House. The remains of Lincoln and his son were placed in the vault at the base o...
Continue reading